Wednesday, March 4, 2009

Right.

I've managed to grab some more time in the garage recently as the house is now very much on the market.

The rear end is now about 90% done, all that still needs doing is the rearmost top rail and the 2 tubes between that and the bottom one.

I've been taking some measurements for the transmission tunnel, and due to the differential input flange being off-centre (towards the drivers side - typical!) I may have some trouble fitting seats in, so i may go down the route of home made seatin, but, i'll cross that bridge when i come to it.

Today i have ordered the suspension mounting brackets and mushroom adaptors from 3ge components. My front wishbones should be on their way in the next few weeks - many thanks to Shug at Clyde Auto Marine who are making them for me! When all that arrives, I'll actually be able to fit 4 wheels and officially call it a rolling chassis!

As always, I'll post some pics soon.

No comments: